Start with ownership. Work on the private portion of a driveway is different from work within a road right-of-way. The right-of-way may include the curb, sidewalk, grassed boulevard, paved apron, utilities, and land between the road and the private property line.

When local approval enters a driveway project

Contact the municipality before finalizing a quote when the project:

Do not assume the contractor or the property owner automatically holds permit responsibility. Put responsibility, fees, drawings, inspections, deposits, restoration, and timing in the written scope.

Always re-check the official page

Rules, fees, forms, processing times, and contact details change. The summaries below were reviewed on September 2, 2026 and deliberately avoid reproducing fee tables.

Information to gather before you call

Before construction starts

  1. Receive the required approval in writing.
  2. Confirm who calls for inspections and who holds deposits.
  3. Confirm utility locates and the water shut-off location.
  4. Give the approved drawings and conditions to the site supervisor.
  5. Keep required permits available on site.
  6. Do not improvise a wider curb cut or different material in the field.
  7. Complete closeout inspections and deposit-release steps.